Project Description:
Kechuang Group Hotel Digital Technology Conference Hall, with a project area of 400m² and a venue for 180 people. The design has increased the sense of science and technology, the language clarity required by the press hall, the recording , broadcasting, on-site audio and video capture equipment for reporters' interviews. During the press conference, the staff was intensive, so we focused on environmental protection and fire protection (Class A fire protection). In the early stage, a large number of acoustic modeling and 3D simulation calculations were executed, and the final design adopts SWAP quick-installed sound-absorbing panels to ensure that the acoustics meet the standards and meet all requirements of electro-acoustic sound reinforcement equipment. (The reverberation time is less than or equal to 1.0 second, strengthen the control of a direct sound and a reflected sound).